Huating New Energy Vehicle Power Battery Plant Planning Design and Project Management

The project is located in Hefei Economic and Technological Development Zone, with a total construction area of 37724 square meters, a three-story factory building, and a four-story frame structure (C level 1) for the office area. After the project is put into production, the annual production capacity can reach 4GWH new energy vehicle power batteries.

Project

The project is located in Hefei Economic and Technological Development Zone, with a total construction area of 37724 square meters, a three-story factory building, and a four-story frame structure (C level 1) for the office area. After the project is put into production, the annual production capacity can reach 4GWH new energy vehicle power batteries.

1

Kewywords : Engineering consulting design/EPC project general contracting/energy-saving technology + smart operation and maintenance/whole process engineering consulting/energy-saving products/smart operation and maintenance