NIO Auto's annual production of 100,000 sets of new energy vehicle body project management center and dining center EPC project

The project is located in Hefei Economic and Technological Development Zone. The construction includes: dining center, management center, general assembly workshop ground source system, and management center ground source system. Among them: the dining center covers an area of 3260.26 square meters and a building area of 4905.9 square meters; the management center covers an area of 3836.2 square meters and a building area of 7935.48 square meters.

Project

The project is located in Hefei Economic and Technological Development Zone. The construction includes: dining center, management center, general assembly workshop ground source system, and management center ground source system. Among them: the dining center covers an area of 3260.26 square meters and a building area of 4905.9 square meters; the management center covers an area of 3836.2 square meters and a building area of 7935.48 square meters.

1

Kewywords : Engineering consulting design/EPC project general contracting/energy-saving technology + smart operation and maintenance/whole process engineering consulting/energy-saving products/smart operation and maintenance